Alderney Renewable Energy
  • Company
    • About ARE
      • 65 Year Licence
    • Meet the team
  • Tidal Energy
    • The Case for Tidal
    • Tidal Technology
    • Future Energy Challenges
  • Environment
    • Strategic Environmental Assessment Framework
    • Alderney Tidal Resource
    • Surveys
      • Secure Area
  • Projects
    • Tidal
    • FABLink
  • Media Centre
    • News
    • Media Contact
    • Resources
    • How tidal works: Overview
  • Gallery
  • Contact
  • Links

Gallery

16m 2.2 MW Turbine Shipment Image 1
16m 2.2 MW Turbine Shipment Image 1
16m 2.2 MW Turbine Shipment Image 2
16m 2.2 MW Turbine Shipment Image 2
Turbine Foundation Fabrication
Turbine Foundation Fabrication
16m 2.2 MW Turbine under construction as the DCNS Ship Yard in Brest
16m 2.2 MW Turbine under construction as the DCNS Ship Yard in Brest
16m Tidal Turbine - Artists Impression
16m Tidal Turbine - Artists Impression
Computer Generated Image of Installed 2.2 MW 16m Turbine
Computer Generated Image of Installed 2.2 MW 16m Turbine
16m 2.2 MW Turbine within the Installer Barge
16m 2.2 MW Turbine within the Installer Barge
Turbine Installer Barge
Turbine Installer Barge
16m 2.2 MW Turbine Shipment Image 2
16m 2.2 MW Turbine Shipment Image 2
Aerial Image of Alderney
Aerial Image of Alderney
Braye Beach - Alderney
Braye Beach - Alderney
Alderney Coastline
Alderney Coastline

Copyright © 2013 ARE. All rights reserved. Email: info@are.gg

Site by Powershift Media Ltd